by Darren Pickett | Sep 19, 2022
Design and Construction of Filter Renewals and Associated Works at Warrnambool Water Treatment Plant The Warrnambool WTP Filter Refurbishment Project was a particularly challenging project to execute as strict adherence to schedule was required to ensure the WTP would...
by Darren Pickett | Sep 2, 2022
The Merrimu WFP sodium fluoride system upgrade comprised the following elements: • New fluoridation plant building, including a new electrical switchroom • New sodium fluoride upflow saturator and day tank • New sodium fluoride transfer pumps and dosing pumps • New...
by Darren Pickett | Sep 2, 2022
The Elanora STP Digester A Upgrade delivered the following scope of works. PART 1 – Anaerobic Digester Wall and floor refurbishment, mechanical equipment and Biogas Compressors replacement PART 2 – Roof refurbishment, mechanical external and internal works, PART...
by Darren Pickett | Dec 6, 2021
Yarra Valley Water required a new Brushy Creek STP Class B Chemical Dosing Facility. The chemicals dosed at this facility are aluminium sulphate (alum) and sodium hydroxide (caustic). The upgrade included – Construction of new chemical dosing facility (CDF)...
by Darren Pickett | Sep 23, 2021
The Laanecoorie WTP has a nominal capacity of 3.8 ML/d and treats water from the Loddon River for supply of drinking water to the towns of Laanecoorie, Dunolly, Tarnagulla and surrounding areas. The upgrade works under this contract were brought about to address a...