The previous inlet works screening system had reached the end of its design life, and the structural integrity of the concrete channel in which it operated had become seriously undermined through years of H2S attack of the concrete. This project was initiated to replace the Inlet Works Screen and Channel.

The works delivered the detailed design, supply, installation, and commissioning of;

  • Rotary Drum Inlet screen rated to 100L/s, 3mm perforation, internally fed, and self-cleaning.
  • Connecting Pipework
  • Handrails and platforms
  • General Civil Requirements and modifications/remediation of the existing concrete inlet works structure.

Value: $328K

 

Back to PROJECTS GALLERY