The Scope of Works included the design, supply, replacement, integration, testing, commissioning, and verification of high energy efficiency aeration blowers at the West Wodonga Waste Water Treatment Plant, with provision of performance guarantees.

The Scope also included the disposal of the existing six (6) aeration blowers to be replaced and all and any other equipment, materials and waste as a result of the SOW.

  • 6 x Sulzer Turbocompressor Blowers
  • 7200m3/h
  • 150kW high efficiency
  • Model No. HST 20-6000-1-150/U200
  • Manifolds, valving and pipework

Value: $1.3M

 